by fund-finder-automation | 22 Oct, 2026
Expected Outcome:If the project is on the first action 1) than the project results are expected to contribute to at least three of the outcomes a), b), and c). If the project is on the second action 2) than the project results is expected to contribute at least two of...by fund-finder-automation | 22 Oct, 2026
Expected Outcome:Project results are expected to contribute to at least three of the following outcomes:High Voltage (HV), Extra High Voltage (EHV) or High Power/superconducting cable systems, including dynamic AC – DC cables.Development of not only better performing,...by fund-finder-automation | 22 Oct, 2026
Expected Outcome:Projects are expected to contribute to the following outcomes:The packaging industry will have access to the next generation of biodegradable polymer materials, which will also be recyclable materials. Plastic materials producers will switch from PP,...by fund-finder-automation | 22 Oct, 2026
Expected Outcome:Project results are expected to contribute to all of the following expected outcomes:Increased knowledge about design, construction, assembly and operation and maintenance of floating wind farms.Improved overall constructability, reliability,...by fund-finder-automation | 22 Oct, 2026
Expected Outcome:Project results are expected to contribute to all of the following expected outcomes:De-risking wave energy technology development and increased bankability/insurability of wave energy.Increased availability and improved market confidence in the...